IMPORTANT NOTICE TO ALL
TERRAMAR PROPERTY OWNERS AND
BUILDERS
REQUIREMENTS TO BUILD
REVISED
10-2-2003
By
virtue of authority granted to the Architectural Control Committee in covenants
set forth in Restrictions for all sections of Terramar Beach Subdivision, at
West Galveston Island, Clerk of Galveston County, Texas, please be advised as
follows, to wit:
(ARCHITECTURAL CONTROL-Quote-
No building or
improvement shall be erected, placed or altered in the exterior design after
being erected or placed on any lot in the Sub-division until construction plans,
landscaping plans, or other plans, specification and a plot plan showing the
location and size of such building or improvement have been submitted to the
ARCHITECTURAL CONTROL COMMITTEE, or its designated representative, and have been
approved in writing by such Committee or its designated representative, as to
the harmony of external design with existing structures on lots in the
subdivision, as to the type of exterior materials and exterior paint color, as
to quality of workmanship and materials, and as to location with respect to
topography and finished ground elevations...)
In accordance with the
above, the Architectural Control Committee of Terramar Beach Community
Improvement Association shall be furnished TWO (2) complete set of plans with
the ENGINEERED SEAL and specifications for all proposed new home construction
within the bounds of Terramar Beach Subdivision, or for any substantial addition
to existing houses, including plot plan, floor plan, all wall elevations,
complete structural details for foundations, wall and roof framing, wind
bracing, exterior wall covering, interior wall finish, showing grade and size of
all materials to be used, and type of roof covering to be used, it being
specifically required that all nails, bolts and metal fastenings shall be
galvanized or the equivalent rust resistant quality subject to approval of the
Architectural Control Committee, EXCEPT that all nails, bolts and metal
fastenings directly exposed to weather conditions shall
be HOT -DIPPED GALVANIZED or TREATED GUN NAILS.
All
plans and specifications and materials and workmanship shall be subject to
acceptance and approval of the said Committee, and no construction shall be
authorized or commenced prior to issuance of written acceptance and approval of
said plans and specifications, and any violation hereof shall be sufficient
cause for legal process against owner, builder and contractor and they shall be
held liable in damages for any expenses incurred by said Committee in enforcing
these requirements. PENALTY: $
500.00.
It is hereby further provided that, at the option of Terramar
Beach Community Improvement
Association, owner, builder or contractor
shall furnish RELEASE OF LIABILITY AND HOLD HARMLESS agreement in favor of said
Association and shall, if requested furnish required insurance policy to support
such agreement.
Property Owners, Builders and Contractors are hereby
advised not to sign any building contracts or make or accept any advance
deposits for any proposed new construction or substantial alteration to existing
buildings prior to receipt of issuance of Galveston City Building Permit, City
and State Health Department Permit, and written acceptance of
plans and specifications by said Terramar Architectural
Committee.
REVISIONS AND STIPULATIONS FOR PLANS AND SPECIFICATIONS OF THE
HOUSE TO BE
BUILT..............
BY___________________________________________________________________
FOR
_________________________________________________________________
LOT____
, BLOCK______, SECTION____, TERRAMAR BEACH SUBDIVISION
Site
Preparation: Lot shall be graded (filled if necessary) to
prevent water standing beneath house. Site shall be cleaned
of all debris upon completion of construction.
Culverts:
No culvert shall be set in ditch to enter lot from
street except as shall be approved by Terramar Architectural Control
Committee.
Foundation Pilings: 10 x 10 rough
yellow pine #2 or better, not less that 12 lb. pressure treated penta or
equivalent, to be set MINIMUM 9 feet sub-surface and MINIMUM
9 feet skyward, both from mean grade of lot. MAXIMUM 9 OC on girder line, 12
between girds, 4 rows of piling required.
Girders:
Two 2 x 12 nominal YP#2 or better, pressure treated penta or
equivalent, notched into piling heads(notches to be sawed-not ax-chopped), to be
bolted with 3/4 hot-dip galvanized bolts (through both girders and
pilings).Splices of girders to be staggered on piling. Knee
braces from girders to pilings to be 2 x 6 nominal YP #2 or better, pressure
treated penta or equivalent. Knee braces on all pilings,
extending every possible direction, braces leg bolted to sills, joists and
pilings.
Floor Joists: Not less than 2 x
8 nominal YP #2 or better, set not more than 16 inch on centers.
Solid blocking to be set between joists midway between bearing points on
girders. Joists to be doubled at all bearing wall positions.
Header joist to be set at joist ends. All joists at perimeter of building to be
pressure treated penta or equivalent. All floor joists shall be secured to
girders with 2 x 6 cripples nailed between girders and extending upward to top
of joists and nailed to joists. All nails to be hot - dipped
galvanized,(2 x 6 cripples required for maximum prevention of floatation or
lateral movement).
Walls: Plates to be not less than 2 x 4
nominal YP #2 or better. Studs to be not less than 2 x 4 YP
#2 or better, set not more than 17 inch on centers, with corner braces all walls
and galvanized steel wind braces. Fire-stop blocking to be set in all walls
midway between floor and ceiling. Window and door headers up to 3 feet opening
to be 2 x 6 nominal, such headers more than 3 feet up to 5 feet to be 2x 8
nominal, such headers more than 5 feet up to 8 feet to be not less than 2 x 10
nominal, all YP #2 or better.
Ceiling Joists: Not less than 2 x
6 nominal YP #2 or better, set on not more than 16 inch on centers, with L
brace over center of rooms more than 10 feet
wide.
Rafters: Not less than 2 x 6 nominal YP
#2 or better, set not more than 16 inch on centers with L brace set under
rafters midway between plates and ridge. Rafters to be wind braced from all
directions. Opposite rafters to be cleated together under ridge.
Metal fasteners on all rafters at plate line.
Roof
Decking: Not less than C D x 5/8 inch plywood (NOT SHOP
GRADE).
Roof Covering: Not less than 235 LB.
seal tab composition shingles applied over not less than
30LB. felt (Recommend lot less than 6 inch lap on
felt).
Siding: As per plans, rough cedar,
vinyl, western select grade, applied over, (here required), not less than 30 LB.
felt with minimum 6 inch lap. Nails to be hot-dipped galvanized . Aluminum or
Composition siding not approved.
Exterior
Doors: Solid slab or glass patio doors.(design choice of
owner).
Interior Doors: Choice of owner
<!--[if
!supportEmptyParas]-->Sub-Floor: 3/4 OSB - tongue
and groove (glued and nailed)
Windows: Must meet City of
Galveston Energy Code Requirements. Compliance tools available from http://www.energycodes.gov/
Size
of House: Not less than 600 sq. ft. enclosed area for
Section 1,2 and 3. Not less than 900 sq. ft. for Sections 4,5 and 6 , Not less
than 750 sq. ft. for Section 7. Not less than 1200sq.ft. for
Section 8. All being enclosed areas, exclusive of decks and
porches.
Porches &
Decks: All joists, decking and railings to be of YP #2 or
better, pressure treated penta or equivalent. All nails and
metal fastenings to be hot-dip galvanized.
Stairs: Three (3)
stringers, treads, railings, support posts, bracing, etc., to be YP #2 or
better, pressure treated penta or equivalent. All nails to be
hot-dip galvanized.
Plumbing: All plumbing
installations shall be of good quality standard material and fixtures and shall
be installed in accordance with maximum health and safety design and
requirements. Septic system plans shall also be approved by
Architectural Control Board. Two sets required.
Electrical: All electrical
installations shall be in accordance with maximum electrical and fire prevention
safety design and requirements asset forth in National Electrical Code and
National Fire Prevention Codes. COPPER WIRE only shall
be used.
Mechanical: Water heaters
and air-condition units shall be elevated to level of floor of main
dwelling. A/C unit must be secured.
Nails & Metal Fastenings:
All shall be of HOT-DIP galvanized (includes all bolts), fasteners on all
studs top and bottom and rafter tails.
Miscellaneous: All
Galveston City Building Codes shall be complied with, but such compliance shall
not in any way constitute any authority for lesser structural quality than
required by Terramar Beach Association or Architectural Control Committee
hereof, T.C.P.I.A. specifications will be enforced.
The stipulations herein set forth shall supersede
anything to the contrary contained in the plans and specifications attached
hereto.
Other Requirements by Terramar
RAFTERS: - Notwithstanding
anything herein to the contrary, all rafters as used for cathedral ceilings
shall be bound by galvanized or equivalent metal bands, not less than #24
GA.,width of rafters, securely nailed with galvanized nails on top of sheathing,
but under each side of ridge along all said rafters.
EXTERIOR SIDING: - Choice
of owner, except, if plywood (4 x 8) sheets, not less than 7/16 thickness,
exterior grade; if single board and batten, boards not less than 3/4 nominal
thickness. Hardboard (Masonite) type siding permitted only
over not less than 1/2 plywood sub-sheathing. Any other type
of siding to be specifically approved by Terramar.
FOUNDATION PILINGS: - Minimum piling size
shall be 10x 10. Pilings set on Gulf side of Steward Road shall be set not
less than nine (9) feet skyward. Piling set for canal-front
lots shall not be less than three(3) feet landward from bulkhead; and piling set
in water shall be of (16) pound salt water marine pressure treated CCA, 10 x
10 square, and shall be set not less than eight(8) feet sub-surface from the
land beneath the water. Pilings set within five (5) feet of bulkheads on land
side shall be not less than nine (9) feet sub-surface from land at location of
such piling.
NOTE: The structural
requirements stipulated herein are for the house plans to be built for owner and
on lot shown on page (2) hereof, and shall not be construed as final
requirements for all houses built in Terramar Beach.
ALL HOUSE PLANS SHALL CARRY A
STRUCTURAL ENGINEERS SEAL.
ALL CONSTRUCTION SHALL MEET
T.C.P.I.A. REQUIREMENTS.
Time limit for completion of construction: 1 year (12
months) interior and exterior of new homes. This will reduce vandalism and
unsightly conditions. Builder/owner/contractor must provide a dumpster on
the property along with a retaining fence on three sides of property. Must clean
up daily .
Port-O-Pottys must be available on job site by
contractors when work commences.
Pilings that are put in for a new home, whereas a
home is not constructed, the pilings shall not sit longer than six (6) months.
If they do, they must be removed at owners expense. If pilings are not removed
by owner, the TBCIA will have them removed at owners expense.
Plus any and all legal fees accrued.
Plan approval is required fifteen (15) days prior to
start of construction.
Architectural Chairman shall have the owner to halt
construction if requirements are not met. Chairperson will
report any halting of construction to President or Vice-President of
TBCIA
ACCEPTED BY:
______________________________________________________
SIGNATURE OF AUTHORIZED PERSON
FOR ABOVE:
________________________________________________________
TITLE:
_____________________________________________________________
An Architectural Control Fee of One
Hundred Dollars ($100.00) , subject to
increase without notice, shall be paid to the order of Terramar Beach Community
Improvement Association and shall accompany submission of plans and
specifications as herein above required.
NOTICE:
NO BUILDING PERMIT WILL BE ISSUED FOR CONSTRUCTION OF
ANY NATURE ON ANY LOT WITH OUTSTANDING UNPAID FEES DUE FOR MAINTENANCE,
MOWING OR ANY OTHER CHARGES AGAINST THE LOT.